Patel Engineering has been awarded the LOA from City and Industrial Development Corporation (CIDCO) for the construction of a 6.70 km long treated water tunnel and associated works from Sai Village to Vindhane Village in Raigad District of Maharashtra.

Tags: Previous Next
Generated by Feedzy